Lobby, porte cochere and reception
Use a composed arrival sequence with focal lighting, exterior threshold control and a clear evening scene.
Project Study / Dubai Hotel
This study considers how arrival, guest comfort and long-term operation can inform a Wired KNX route, lighting scenes and the product detail required by the project team.
For the project team
For developers, hospitality designers, MEP consultants, fit-out contractors and system integrators, Kalixa turns guest-facing scenes into a clear control direction, lighting selection and specification package.
Guest journey
Use a composed arrival sequence with focal lighting, exterior threshold control and a clear evening scene.
Coordinate bedside, circulation, blackout and cleaning scenes around a calm, repeatable room experience.
Give teams flexible modes for service, event set-up, closing and night-time exterior presence.
Control direction
Assess KNX or an engineered wired path when the brief needs robust coordination across guest rooms, public areas, curtains, sensors and operational scenes.
Assess wireless or hybrid control when the hotel needs improved scenes and a lower-impact route through existing infrastructure.
Project shortlist
KX-LA-024
A focal chandelier for lobby, reception or pre-function arrival spaces.
KX-SG-011
A warm, controlled wall-light layer for corridors, suite entries and bedside positions.
KX-EO-001
An architectural exterior layer for arrival edges, facades and hospitality terraces.
Specification support
Start a Dubai hotel brief
Continue the Project Route
Move from the hospitality brief to a Wired KNX direction, product detail and a project conversation.
Consider arrival, guest rooms, dining and exterior lighting as one operating sequence.
Explore the solutionReview the control backbone, interfaces and long-term operating logic.
View the system directionBring the drawings, room schedule and control intent into one discussion.
Discuss the project